.. _htg_bring_up_dc:
|
||
|
||
##########
|
||
DC BringUp
|
||
##########
|
||
|
||
Make sure to have completed the bring up of the CP signaling as
|
||
described in :ref:`htg_basic_bringup`.
|
||
|
||
For a DC charger, CP is essential. Several other pieces of hardware need
|
||
to be brought to life as well, though. This gives you a minimal setup
|
||
before testing the complete setup:
|
||
|
||
- The DC power supply that delivers the charging current to the car
|
||
- Isolation monitoring device
|
||
- Optional: Proximity pilot
|
||
|
||
Let's start with the DC power supply as this is the most important one.
|
||
|
||
DC Power Supply
|
||
===============
|
||
|
||
Make sure the high voltage output of the DC power supply is isolated and
|
||
nothing is attached to it that could draw current or get destroyed by
|
||
high voltages. Make sure it is safe to set the maximum voltage.
|
||
|
||
.. warning::
|
||
|
||
Follow all relevant safety precautions.
|
||
Only trained personnel may execute this step.
|
||
High voltages may cause severe injury including death.
|
||
|
||
We will only check the most important features required for a minimal
|
||
CCS charger setup. Check IEC 61851-23 for a full set of requirements.
|
||
|
||
We will manually set voltages up to the maximum voltage and verify the
|
||
driver functionality and the performance of the power supply under
|
||
no-load conditions.
|
||
|
||
Create a simple BringUp configuration file that contains only the
|
||
BUPowerSupplyDC module and the actual driver module / bridge module to
|
||
your external driver. There are a couple of examples that you can
|
||
modify: ``config-bringup-huawei.yaml``, ``config-bringup-uugreen.yaml``,
|
||
``config-bringup-api-powersupply.yaml``.
|
||
|
||
Start the BringUp & Qualification session with the following command in
|
||
the build folder:
|
||
|
||
.. code-block:: bash
|
||
|
||
/etc/everest/run_tmux_helper.sh /etc/everest/bringup/config-bringup-mypowersupply.yaml /usr
|
||
|
||
Now make sure to complete the checklist:
|
||
|
||
Start with the power supply being switched off. Set the maximum output
|
||
voltage (e.g. 1000 V) and then switch the power supply to export mode
|
||
(rectifier mode, power supply outputs power to the car). Make sure to do
|
||
it in exactly this order:
|
||
|
||
- Verify that the reported capabilities are matching the
|
||
manufacturer's specifications for the power supply.
|
||
|
||
- Verify that the output voltage is reached within 6 seconds. If it
|
||
stays on a lower voltage, the power supply driver may “forget” the
|
||
voltage setting when being switched on or off. This needs to be
|
||
fixed. The driver should work independently of the order of setting
|
||
output voltage and switching on/off.
|
||
|
||
- Verify the output voltage and current is measured accurately.
|
||
Compare against an external voltage meter and a current meter (IEC
|
||
61851-1:2023 CC.6.3 requires +- 10 V for voltage and +-1.5% for
|
||
current or 0.5 A - whichever is more).
|
||
|
||
- Verify that there is no overshoot when changing voltage from lowest
|
||
to highest output voltage. This may cause problems in CableCheck
|
||
phase on some EVs.
|
||
|
||
- Verify the measured output voltage is correctly reported back to
|
||
EVerest (see measured output voltage in the BringUp module).
|
||
|
||
- Verify the measured voltage is reported frequently (e.g. every
|
||
second or more often).
|
||
|
||
- Optional: Measure the power factor. Some power supplies have
|
||
problems with power factor correction under no / light load
|
||
conditions. When charging a real car, no load happens during
|
||
*CableCheck* and *PreCharge* phases.
|
||
|
||
Now, set the minimum output voltage that the power supply supports
|
||
(e.g. 150 V). On power supplies that have high/low mode switching,
|
||
choose the minimum voltage that the high mode supports. Otherwise, it
|
||
will take quite long to switch from highest to lowest voltage, since the
|
||
power supply will need to change its mode configuration.
|
||
|
||
- Switch the power supply off and verify that the output voltage
|
||
drops to 0 V more or less immediately.
|
||
|
||
- On power supplies with automatic high/low voltage mode switching:
|
||
Switch manually between the highest and lowest voltage setting to
|
||
trigger mode switches. They should be reasonably fast, e.g. < 5
|
||
seconds. Should switching between the modes be necessary during
|
||
charging, it is ok to have a small pause in *CurrentDemand*.
|
||
|
||
- Switch on the power supply at e.g. 500 V and exit the bring up
|
||
setup, so EVerest is no longer communicating with the power supply.
|
||
It should switch off after a timeout. (Most power supplies switch off
|
||
within 10-20 seconds after communication loss.)
|
||
|
||
Isolation monitor device
|
||
========================
|
||
|
||
The isolation monitor needs to comply with IEC 61557-8 or equivalent.
|
||
EVerest will use the isolation resistance values as reported by the
|
||
driver module and decide whether to stop the charging session or not. It
|
||
is a good idea to have a redundant switch-off by e.g. using the IMD’s
|
||
built in relay to directly switch the emergency off input of the PSU.
|
||
|
||
To test the correct functionality within EVerest, use the
|
||
BUIsolationMonitor BringUp module and connect it to the driver module.
|
||
An example can be found here:
|
||
|
||
.. code-block:: bash
|
||
|
||
config/config-bringup-isolation-monitor-sil.yaml
|
||
|
||
.. image:: images/bring-up-split-screen.png
|
||
:alt: BUIsolationMonitor Bring-Up
|
||
|
||
Ideally, the BringUp configuration loads both the isolation monitor and
|
||
DC Power supply modules as both are needed to run all tests.
|
||
|
||
- Switch on the “Power supply” at 500 V. Click on “Start
|
||
measurements”. Verify the isolation monitor sees the 500 V output
|
||
voltage. This is to ensure it is actually connected to the correct
|
||
wires. Verify that new measurements are coming in regularly
|
||
(e.g. every second).
|
||
|
||
- Verify that the measured resistance is very high (e.g. 1 MOhm or
|
||
so).
|
||
|
||
- Connect a 100 kOhm (or other value) resistor from the minus wire to
|
||
protective earth. Check how long it takes until the value changes on
|
||
the screen. This should be inline with the specs from the datasheet
|
||
(e.g. <10 seconds for Bender).
|
||
|
||
- Test the same with the plus wire.
|
||
|
||
- Stop the measurements and verify no more measurements are coming
|
||
in.
|
||
|
||
- Start the self-test of the IMD and wait for the result (with the
|
||
power supply still being on). It should take no more than 10 s or so
|
||
to do the self-testing. Many isolation monitors take a long time to
|
||
complete the self-testing. This may cause time-out problems in
|
||
*CableCheck* with some cars.
|
||
|
||
The time it takes until the IMD detects the isolation fault will need to
|
||
be set in the final configuration file.
|
||
|
||
Over-voltage monitor device
|
||
===========================
|
||
|
||
IEC 61851-23:2023 requires a fast over-voltage protection (OVM)
|
||
(6.3.1.106.2). For a minimal proof-of-concept setup in a lab
|
||
environment, you may want to skip this as it is not functionally needed
|
||
for charging. It will be required for certification though.
|
||
|
||
The OVM shall switch off if the DC voltage is above the required limit
|
||
for 9 ms. For bring-up purposes, we want to test if limit is transported
|
||
correctly and if the start and stop commands from EVerest are
|
||
implemented correctly in the driver.
|
||
|
||
An example bring-up configuration using APIs can be found here:
|
||
|
||
.. code-block:: bash
|
||
|
||
config/config-bringup-api-over-voltage-monitor.yaml
|
||
|
||
Add two things to this bring-up configuration:
|
||
|
||
1) A power supply driver connected to a BringUp module
|
||
2) An evse_board_support driver connected to a BringUp module
|
||
|
||
Test setup:
|
||
|
||
- Connect a CP tester to the control pilot and set state C.
|
||
- Set “Allow power on” in the evse_board_support BringUp. The relays
|
||
should close now.
|
||
- Connect a scope with one channel to the high voltage (use a 1000 V
|
||
probe!) and one channel to coil voltage of the relays. Instead of the
|
||
coil voltage, any other signal that triggers when the emergency
|
||
shutdown starts can be used.
|
||
|
||
To test the basic functionality, use the check list below. Start each
|
||
test with a fresh test setup (relays closed).
|
||
|
||
.. note::
|
||
|
||
There are more requirements in the standard - especially regarding timing.
|
||
|
||
- Switch on power supply at 500 V. Set the OVM limit to 550 V and
|
||
start the monitoring. Then, set the power supply to 565 V. The relays
|
||
should open immediately. The point in time when the voltage rises
|
||
above 550 V is t_1 - the time where the coil voltage indicates a
|
||
start of emergency shutdown. Verify with the scope that the time
|
||
between t_1 and t_2 is a maximum of 10 ms (9 ms for detection of
|
||
over-voltage and 1 ms to initate the shutdown.)
|
||
- Repeat for 825 V (limit) and 840 V (DC output voltage).
|
||
- Repeat for 935 V (limit) and 950 V (DC output voltage).
|
||
- Repeat for 1100 V (limit) and 1115 V (DC output voltage). This
|
||
measurement is probably not possible as the power supply is limited
|
||
to 1000 V. It is a test case in table 103 of IEC 61851-23:2023.
|
||
- Set a limit of 550 V. Switch on the power supply at 500 V. Start
|
||
monitoring. Stop monitoring. Set the DC output voltage to 565 V. The
|
||
relays shall remain closed as the over-voltage monitoring is not
|
||
active.
|
||
|
||
More IEC 61851-23 test cases for DC
|
||
===================================
|
||
|
||
For a minimum proof-of-concept setup, it should be enough already.
|
||
|
||
IEC 61851-23 has several more requirements (check the norm for a
|
||
complete list) that need to be fulfilled for a real product. Here is the
|
||
list of mandatory functions from IEC 61851-23:2023 6.3.1.1 that should
|
||
be tested early on as they may influence the final design:
|
||
|
||
- Verify the timing of the CableCheck phase. EVerest will print some
|
||
timing hints on the console. Several cars will timeout and not charge
|
||
if the Cable check takes more than 30 s. Recommendation is to stay
|
||
below 25 s for the complete phase. This may not be achievable with
|
||
off-the-shelf components. It is however crucial to be compatible with
|
||
all EVs. Use e.g. BYD EVs to test for the 30 s timeout in
|
||
*CableCheck*.
|
||
|
||
- Continuous continuity checking of the protective conductor
|
||
according to 6.3.1.2: This can be usually fulfilled by opening the
|
||
relays (potentially under load), but you should consider ramping down
|
||
the DC power supply before opening the relays to protect them.
|
||
|
||
- Verification that the EV is properly connected to the EV supply
|
||
equipment according to 6.3.1.3: This should be compliant
|
||
automatically if the *evse_board_support* and the safety MCU passed
|
||
the BringUp checks.
|
||
|
||
- Energization of the power supply to the EV according to 6.3.1.4:
|
||
This should be compliant if the BringUp checks are passed.
|
||
|
||
- De-energization of the power supply to the EV according to 6.3.1.5:
|
||
Similar to “Continuous continuity checking of the protective
|
||
conductor”.
|
||
|
||
- Maximum allowable current according to 6.3.1.6: This should be
|
||
compliant if the BringUp checks are passed.
|
||
|
||
- DC supply for EV according to 6.3.1.101: This should be compliant
|
||
if the BringUp checks are passed.
|
||
|
||
- Measuring current and voltage according to 6.3.1.102: For charging,
|
||
EVerest uses the voltage and current measurements as reported by the
|
||
power supply (not the power meter). This should be compliant if the
|
||
BringUp checks passed for the DC power supply.
|
||
|
||
- Latching of the vehicle coupler according to 6.3.1.103: This should
|
||
be compliant if the BringUp checks are passed.
|
||
|
||
- Compatibility check according to 6.3.1.104: This should be
|
||
compliant if the BringUp checks are passed.
|
||
|
||
- Insulation resistance check before energy transfer according to
|
||
6.3.1.105: This should be compliant if the BringUp checks are passed.
|
||
|
||
- Protection against over-voltage between DC+ and DC– according to
|
||
6.3.1.106: This is a quite hard requirement (trigger shut-down in 1
|
||
ms after voltage is above limits for 9 ms). It requires both an
|
||
accurate and fast measurement. This needs to be implemented in the
|
||
safety MCU independently of EVerest.
|
||
|
||
- Verification of vehicle connector latching according to 6.3.1.107:
|
||
Not applicable for CCS.
|
||
|
||
- Control circuit supply integrity according to 6.3.1.108: Hardware
|
||
requirement.
|
||
|
||
- Short-circuit check before energy transfer according to 6.3.1.109:
|
||
Test with a 100 Ohm load resistor connected in *CableCheck* as per
|
||
the norm.
|
||
|
||
- User initiated shutdown according to 6.3.1.110: This can be
|
||
implemented either in the BSP (publish var *request_stop_transaction*
|
||
in interface *evse_board_support*) or use *stop_transaction* command
|
||
in *evse_manager* interface. Both are available via the EVerest API
|
||
modules.
|
||
|
||
- Overload protection for parallel conductors (conditional function)
|
||
according to 6.3.1.111: Pure hardware requirement.
|
||
|
||
- Voltage limitation between side B live parts (DC+ and DC–) and
|
||
protective conductor according to 6.3.1.112: Hardware requirement -
|
||
choose especially the IMD wisely.
|
||
|
||
- Shutdown of EV supply equipment according to 6.3.1.113: This should
|
||
be compliant if the BringUp checks are passed.
|
||
|
||
First milestone: Connect a real car, zero power charging
|
||
========================================================
|
||
|
||
Now that all individual components are verified, start EVerest with the
|
||
full configuration that you created earlier.
|
||
|
||
Disconnect the plus wire between your prototype and the cable to the EV.
|
||
On the first tests, no power should be flowing.
|
||
|
||
Start EVerest and wait for the message “Ready for charging”. Then plug
|
||
in the vehicle. Watch the ISO traffic. It should be successful until the
|
||
*PreCharge* phase. Then the EV should stop as it cannot see the voltage.
|
||
|
||
During the start up of the session, monitor the voltage of the DC power
|
||
supply. It should be 500 V in *CableCheck* (or whatever you set in the
|
||
config) and then switch to the EV batteries voltage.
|
||
|
||
Verify that in precharge the output voltage is within +/-20 V of the
|
||
EV's battery voltage.
|
||
|
||
Second milestone: Connect a real car, limited power charging
|
||
============================================================
|
||
|
||
Connect a 5 kOhm resistor in the plus wire between EVSE output and
|
||
connector to EV. This will limit the current flow into the EV, but
|
||
allows voltages to be seen by the EV. Plug in a vehicle. You should now
|
||
get all the way to the *CurrentDemand* phase.
|
||
|
||
Some EVs will stop after some seconds as no current is flowing.
|
||
|
||
Verify all communications are correct. Use Wireshark to verify each step
|
||
of the ISO communication (see Debug chapter).
|
||
|
||
Third milestone: Connect a real car, full power charging
|
||
========================================================
|
||
|
||
If everything was correct in the previous step, remove the resistor and
|
||
connect the plug normally to the EVSE. Start a charging session.
|
||
|
||
Power should now be delivered to the EV in *CurrentDemand*.
|
||
|
||
Verify that the current delivered is what the EV requested and that it
|
||
is also reported correctly in the *CurrentDemandRes* messages. Verify it
|
||
is shown correctly on the in-vehicle display.
|
||
|
||
Verify the AC side is not getting overloaded.
|
||
|
||
.. tip::
|
||
|
||
A good habit is to monitor your prototype with a small thermal camera to
|
||
see if any component overheats.
|
||
|
||
If that works: **Congratulations!** You have successfully charged an EV
|
||
with DC for the first time.
|
||
|
||
Error cases
|
||
===========
|
||
|
||
There are many error cases that should be tested now. Listing all goes
|
||
beyond the scope of this manual. A few examples that should be tested:
|
||
|
||
- Place a 100 kOhm resistor from minus wire to PE. Start a charging
|
||
session. It should also fail in *CableCheck* state.
|
||
|
||
- Test short circuit under full load.
|
||
|
||
- Test load dump: Charge at maximum power and open the relays to zero
|
||
load. Watch the voltage overshoot. The power supplies need to survive
|
||
that multiple times. This does happen in the field with some EVs that
|
||
open their contactors during charging when the onboard controller
|
||
firmware resets.
|
||
|
||
- AC under-/over-voltage input
|
||
|
||
- Over-temperature shutdown
|
||
|
||
- On three-phase AC/DC converters, switch off one phase on the input
|
||
at full load.
|
||
|
||
----
|
||
|
||
**Authors**: Cornelius Claussen |