.. _htg_basic_bringup:
|
||
|
||
################
|
||
Basic BringUp
|
||
################
|
||
|
||
This chapter guides you through the basic bring-up of the control pilot (CP),
|
||
proximity pilot (PP), and relays for both AC and DC chargers. It is a
|
||
prerequisite to the more specific bring-up guides for AC and DC charging.
|
||
|
||
Control Pilot
|
||
=============
|
||
|
||
The first step - both for AC and DC - is to verify the control pilot
|
||
(CP) signal functionality and stability. A lot of problems we have seen
|
||
in the field are related to unstable CP signals. So, this step is key
|
||
for a stable product.
|
||
|
||
The normative requirements are described in IEC 61815-1. This section
|
||
will guide you through the most important requirements specified in the
|
||
norm to be tested at bring-up. It is not complete, IEC gives more
|
||
requirements that should be followed at design time.
|
||
|
||
.. warning::
|
||
|
||
For all parameters: Ensure that the limits are guaranteed over the complete
|
||
temperature and input voltage ranges as well as all other environmental
|
||
factors over the complete lifetime of the product.
|
||
|
||
Being on the edge of the range during bring-up already, will most likely
|
||
result in out-of-spec performance in production due to part tolerance,
|
||
component aging etc.
|
||
|
||
First, verify PWM output with no car / nothing connected to it.
|
||
|
||
You should have an EVSE board support driver for your hardware already.
|
||
|
||
In this how-to-guide, we will use the BringUp & Qualification tool from
|
||
EVerest to select the different CP states manually. This ensures that
|
||
(a) the CP signal is correct and (b) the wiring up to the EVerest HW
|
||
driver is also correct.
|
||
|
||
You can find an example configuration file in EVerest for the BelayBox
|
||
that you can modify to use the correct BSP driver for your hardware:
|
||
|
||
.. code-block:: bash
|
||
|
||
config/bringup/config-bringup-yetidriver.yaml
|
||
|
||
Before you start the bring-up, make sure there is no other EVerest
|
||
instance running (e.g. do a ``systemctl stop everest``).
|
||
|
||
On the target, start it the following way:
|
||
|
||
.. code-block:: bash
|
||
|
||
/etc/everest/run_tmux_helper.sh /etc/everest/bringup/config-bringup-yetidriver.yaml /usr
|
||
|
||
Now, connect an EV simulator where you can set the states A/B/C/E and
|
||
simulate a diode failure / loss of PE connection between EV and EVSE
|
||
failure.
|
||
|
||
State D is not really used anymore nowadays; it dates back to the times
|
||
when lead-acid batteries were used that leak hydrogen gas during
|
||
charging.
|
||
|
||
Connect your EVSE, the simulator and a scope similar to this:
|
||
|
||
.. image:: images/cp-scope.png
|
||
:alt: CP Scope
|
||
:width: 600px
|
||
|
||
Now go through the following checklist step by step:
|
||
|
||
.. tip::
|
||
|
||
Select PWM off / X1, switch EV simulator to state A.
|
||
This should output constant +12 V on the CP line.
|
||
|
||
- Select AC coupling on the scope and verify the ripple noise. There
|
||
is no hard limit, but we recommend keeping it below 100 mV VPP.
|
||
|
||
.. image:: images/constant-cp-line.png
|
||
:alt: Constant CP Line
|
||
:width: 560px
|
||
|
||
- Switch to DC coupling, measure DC voltage range. It must be +12 V
|
||
+/- 5% (11.4 V to 12.6 V). Use a multimeter if your scope does not
|
||
provide sufficient DC accuracy.
|
||
|
||
Now select PWM State F. This outputs constant -12 V on the CP line.
|
||
|
||
- Select AC coupling on the scope and verify the ripple noise. There
|
||
is no hard limit, but we recommend keeping it below 100 mV.
|
||
|
||
- Switch back to DC coupling, measure DC voltage range. It must be
|
||
-12 V +/- 5% (-12.6 V to -11.4 V). Use a multimeter if your scope
|
||
does not provide sufficient DC accuracy.
|
||
|
||
Select *PWM on* with a duty cycle of 5%, and connect the EV on the
|
||
simulator (State B). Note that the images below were done in state A,
|
||
but you should use state B.
|
||
|
||
- PWM frequency: Must be in the range 980 Hz - 1020 Hz. It should be
|
||
1000 Hz.
|
||
|
||
.. image:: images/pwm-freq-1.png
|
||
:alt: PWM Frequency
|
||
:width: 560px
|
||
|
||
- Measure the (high) pulse length for the 5% duty cycle. Measure the
|
||
time between the zero crossings. It should be 50 µs.
|
||
|
||
.. image:: images/pwm-freq-2.png
|
||
:alt: PWM Frequency
|
||
:width: 560px
|
||
|
||
- Equivalent source resistance: 970 - 1030 Ohm. Using a 1% 1-kOhm
|
||
resistor should be sufficient to fulfill this requirement if the
|
||
output of the PWM generator is low impedance.
|
||
|
||
- Set state B and verify that the PWM duty cycle can be set to any
|
||
value between 5% (HLC) and the maximum current value your EVSE
|
||
supports (e.g. 53.3% for 32 A for AC). For AC, the maximum PWM for
|
||
your application can be calculated with:
|
||
|
||
.. math::
|
||
|
||
dutycyclePercent = maxAmpere / (0.6 * 100)
|
||
|
||
For DC, it is always 5%. The range from 5% to
|
||
10% is not used and it is ok to not support PWM in that range.
|
||
|
||
- Set state B, which will have a PWM voltage range from +9 V to -12
|
||
V. Verify rise time is below 10 µs from 10% (-9.9 V) to 90% (6.9 V)
|
||
of the signal. The example has a rise time of 4.3 µs.
|
||
|
||
.. image:: images/pwm-freq-3.png
|
||
:alt: PWM Frequency
|
||
:width: 560px
|
||
|
||
- State B: Verify fall time is less than 13 µs. As you can see in the
|
||
screenshot, the fall time is 10.68 µs, which is longer than the open
|
||
circuit time due to the diode in the EV simulator.
|
||
|
||
.. image:: images/pwm-freq-4.png
|
||
:alt: PWM Frequency
|
||
:width: 560px
|
||
|
||
- Set state C. Verify rise time is below 7 µs from 10% (-10.2 V) to
|
||
90% (4.2 V) of the signal. The example has a rise time of 3.08 µs.
|
||
|
||
.. image:: images/pwm-freq-5.png
|
||
:alt: PWM Frequency
|
||
:width: 560px
|
||
|
||
- State C: Fall time must be less than 13 µs from 90% (4.2 V) to 10%
|
||
(-10.2 V) of the signal. The example has a fall time of 12 µs which
|
||
is in range.
|
||
|
||
.. image:: images/pwm-freq-6.png
|
||
:alt: PWM Frequency
|
||
:width: 560px
|
||
|
||
- Set State E (sometimes called *CP Error* or so). The CP signal
|
||
should be at 0 V constantly according to the norm. Some EV simulators
|
||
only short after the diode as seen in the screenshot. Make sure that
|
||
your CP detection circuitry also treats that as state E.
|
||
|
||
.. image:: images/pwm-freq-7.png
|
||
:alt: PWM Frequency
|
||
:width: 560px
|
||
|
||
- Test diode failure detection: Short the diode on the EV side. Many
|
||
off-the-shelf EV simulators can be easily modified with an extra push
|
||
button if it is not included already. Verify that the BSP throws an
|
||
error (DiodeFault)
|
||
|
||
- Test short state changes: Toggle between states B, C, B quickly to
|
||
produce a short time in state C (about 200 ms or less). The short
|
||
state C should be reliably reported to EVerest. It is a common issue
|
||
that the safety MCU filters out state durations that are too short.
|
||
This will cause issues with the BCB toggle wakeup sequence detection
|
||
of ISO 15118-3.
|
||
|
||
- Disconnect PE between EV and EVSE. This should be detected as an
|
||
error or state A.
|
||
|
||
Now that the basic functionality is working, test stability of the state
|
||
detection. Most cheap EV simulators only use the nominal resistor values
|
||
to test the states, but ideally you have a simulator that can use the
|
||
minimum and maximum values for each state.
|
||
|
||
Ensure that the following states are detected correctly over the
|
||
complete range:
|
||
|
||
+-----------------+-----------------+-----------------+-----------------+
|
||
| State | Minimum R | Nominal R | Maximum R |
|
||
| | applied by EV | | applied by EV |
|
||
+=================+=================+=================+=================+
|
||
| B | 1870 Ω | 2740 Ω | 4610 Ω |
|
||
+-----------------+-----------------+-----------------+-----------------+
|
||
| C | 909 Ω | 1300 Ω | 1723 Ω |
|
||
+-----------------+-----------------+-----------------+-----------------+
|
||
|
||
If possible, use a debug GPIO, that shows the exact timing of the ADC
|
||
sampling and connect it to the second channel of your scope like this:
|
||
|
||
.. image:: images/pwm-freq-8.png
|
||
:alt: PWM Frequency
|
||
:width: 560px
|
||
|
||
In the screenshot, two PWM signals are shown. The cyan one is 5% duty
|
||
cycle and the yellow one is 95% duty cycle. The magenta signal shows the
|
||
time the ADC reads the signal. As you can see, the first magenta pulse
|
||
is nicely aligned with the end of the low part of the PWM, so it will
|
||
read the -12 V reliably even at 95% duty cycle.
|
||
|
||
The second magenta pulse is nicely aligned with the high part of the PWM
|
||
providing stable readings even at just 5% PWM. The 5% case is the more
|
||
critical one, as very high duty cycles are not typically used.
|
||
|
||
The most common problem for unstable CP detection (which results in
|
||
charging sessions breaking and potentially leads to relays opening under
|
||
full load) is that the ADC sampling time starts too early or ends too
|
||
late. In both cases it will capture part of the edge of the high part of
|
||
the signal, resulting in a lower measured value. This can lead to e.g. a
|
||
state C detection while it is state B in reality.
|
||
|
||
Make sure to observe the correct timing under real conditions with a car
|
||
attached. With an open circuit and the 2 µs rise time, timing may be
|
||
perfect, but with a car attached and a 10 µs rise time it may not work
|
||
correctly.
|
||
|
||
This is especially critical at the 5% duty cycle as the high part is
|
||
only 50 µs long. Never sample in the first 10 µs. When using the MCU to
|
||
synchronize ADC and PWM, make sure that interrupt priorities are set
|
||
correctly so that additional (interrupt) load on the MCU does not lead
|
||
to delayed ADC triggers *sometimes*.
|
||
|
||
This needs to be 100% stable over long periods of time (hours/days !).
|
||
Some MCU (especially those made for motor control) can trigger the ADC
|
||
synchronously with the PWM generation without involving an interrupt
|
||
routine.
|
||
|
||
Apply some filtering and averaging in software (e.g. average over 10
|
||
pulses, filter out the highest and the lowest value or similar). It
|
||
should not detect a wrong state, not even a single time.
|
||
|
||
Do not filter too much though. This is another common flaw that should
|
||
be tested at this stage: IEC 61851-1 requires switching off power when
|
||
the EV transitions from C2 to B2 within 100 ms. As the relays also take
|
||
some time to open, do not delay the detection of the state change by
|
||
more than 50 ms due to filtering. Report all state changes to EVerest,
|
||
also those that are short-lived. Otherwise, some features will not work
|
||
correctly, e.g. ISO 15118 resume after pause.
|
||
|
||
Now test with several different real cars as well, as the implementation
|
||
on the EV side differs a bit across vendors and models.
|
||
|
||
Relays
|
||
======
|
||
|
||
The AC output contactor bring-up is the same as for the DC output relay.
|
||
|
||
Verify the correct function of the relay. Command the MCU to close the
|
||
relay (use the BringUp tool’s *Allow power on* button) and verify it
|
||
closes the relay in a timely manner (given that there is no RCD error
|
||
etc).
|
||
|
||
EVerest will issue the *allow_power_on/force_power_off* commands to the
|
||
BSP driver just like you can do it in the BringUp module. It is
|
||
important to understand the logic:
|
||
|
||
If the safety MCU receives an *“Allow power on”*, it may switch on the
|
||
relay if all other requirements are met (e.g. CP in state C, RCD current
|
||
ok, temperature in range etc). The MCU may decide to not switch on the
|
||
relay if some other local requirements are not met. It is just important
|
||
to always report the actual relay state with the PowerOn/PowerOff
|
||
events.
|
||
|
||
The following checklist tests if the safety MCU behaves correctly in
|
||
regard to the CP state C2. It does not test for other requirements such
|
||
as over-temperature etc.
|
||
|
||
If the safety MCU receives a force power off from EVerest, it shall
|
||
open the relay immediately.
|
||
|
||
Complete the following checklist:
|
||
|
||
- State A, PWM off, force power off. Set State B then enable PWM 5%
|
||
and then C.
|
||
Then allow power on. Relays should switch on within a short period
|
||
of time after sending allow power on. You should see a “Power On”
|
||
event (the time between “Allow power on” and the “Power On”
|
||
feedback event should be short, e.g. less than 300 ms or so, no
|
||
hard limit here). Click on “Force power off”. You should see a
|
||
“Power Off” (same timings as above). These timings should be short
|
||
- see below. You can click “Power On/Off” a couple of times and
|
||
verify the timing of the feedback.
|
||
|
||
- Toggle the relay on and off a couple of times and observe the
|
||
PowerOn/PowerOff events. There should be exactly one event for each
|
||
on or off switching of the relay. Make sure that there are not
|
||
multiple PowerOn/PowerOff/PowerOn events being generated because the
|
||
relay is bouncing.
|
||
|
||
- State A, PWM off, state State B. Then enable PWM 5%, allow *power on*.
|
||
Relay should not close. Wait a few seconds, then set state C.
|
||
Relay should close immediately after entering state C. Ignore the
|
||
time shown on the “Power On” event. It measures the time from the
|
||
last “Allow power on” command to feedback.
|
||
|
||
- State C, PWM 5%, Relay closed. Then set state B. Relay should open
|
||
immediately (max 100 ms). Go back to state C. Relay should close
|
||
again. (IEC 61851-1:2017 Table A.6: Sequence 8.1)
|
||
|
||
- State C, PWM 5%, Relay closed. Then stop PWM but stay in state C.
|
||
Relay should open after a minimum of 6 seconds. (IEC 61851-1:2017
|
||
Table A.6: Sequence 10.2)
|
||
|
||
Timing on closing relays is quite relaxed, but ISO 15118 has a limit of
|
||
one second from the ISO command to switch on to the ISO feedback that it
|
||
was done. As most of the time is spent in the ISO communication stacks,
|
||
the MCU should ensure that the time from commanding the relays to close
|
||
to receiving the feedback that it was closed correctly should be in the
|
||
order of 100 ms in the MCU.
|
||
|
||
Timing on opening the relays is more critical and a good value is
|
||
opening within 50 ms after the command arrives at the latest. IEC
|
||
61851-1 requires the relay to be open after a maximum of 100 ms after
|
||
state C->B (or A etc) transition.
|
||
|
||
Verify that the feedback is reported correctly. A typical error during
|
||
bring-up with EVerest is missing relay feedback. Make sure they are
|
||
always reported to represent the relay state correctly. Send the events
|
||
on any change, regardless of the cause of switch on or off in the MCU.
|
||
|
||
Proximity Pilot
|
||
===============
|
||
|
||
This section is for Type 2 CCS Chargers. PP works a little different for
|
||
Type 1 Chargers.
|
||
|
||
For AC chargers with a type 2 socket, PP needs to be verified as well.
|
||
AC Chargers with a permanently attached cable do not use the PP signal.
|
||
DC chargers normally do not use PP as they have an attached cable,
|
||
however it may be used in some configurations to e.g. detect a cut
|
||
cable.
|
||
|
||
Most of the EV simulators can only switch the nominal resistor values
|
||
for 13 A/20 A/32 A. To test the PP functionality, you could e.g. use
|
||
small wired resistors and connect them manually between PP and PE or
|
||
build yourself a small tester that can do the minimum/nominal and
|
||
maximum resistor values.
|
||
|
||
Verify that the BSP reports the correct cable ampacity for all values in
|
||
this table:
|
||
|
||
================= ========= ========= =========
|
||
Cable ampacity Minimal R Nominal R Maximal R
|
||
================= ========= ========= =========
|
||
13 A 1100 Ω 1500 Ω 2460 Ω
|
||
20 A 400 Ω 680 Ω 936 Ω
|
||
32 A 164 Ω 220 Ω 308 Ω
|
||
63 A 3ph/70 A 1ph 80 Ω 100 Ω 140 Ω
|
||
================= ========= ========= =========
|
||
|
||
Values below 60 Ω above 4500 Ω should be treated as errors and the BSP
|
||
should report “None” as PP ampacity. Resistor values in between the
|
||
defined ranges in the table should be treated as the lower ampacity
|
||
value.
|
||
|
||
Ensure that PP is measured quickly after plug-in of the vehicle. The MCU
|
||
should also monitor PP throughout the complete charging session and
|
||
report an error if PP connection breaks.
|
||
|
||
With CP/PP and relays, the minimal setup for AC charging has already
|
||
been verified.
|
||
|
||
.. tip::
|
||
|
||
In addition, you may want to verify a few more components before charging a
|
||
real car.
|
||
But you can also do this later on.
|
||
|
||
Once the CP signaling has been verified you can continue with the bring up of
|
||
the powermeter and the bringup for AC or DC, depending on your use case.
|
||
|
||
- :doc:`AC BringUp </how-to-guides/bringup/ac>`
|
||
- :doc:`DC BringUp </how-to-guides/bringup/dc>`
|
||
- :doc:`BringUp Powermeter </how-to-guides/bringup/powermeter>`
|
||
|
||
----
|
||
|
||
**Authors**: Cornelius Claussen |