# Operate phase
|
||
|
||
In [Operate phase](../../general-description/operate-phase.md) the informative description of the operate phase processes are provided.
|
||
In this chapter, the use cases will be described as derived from the operate phase.
|
||
|
||
The USEF MCM operate phase specifies the following use cases:
|
||
|
||
_Use cases for the operate phase._
|
||
|
||
| Name | Direction | Message types |
|
||
|---------------------------------------------------------------|-----------|---------------------------------------------------|
|
||
| [Exchange updated D-Prognoses](#exchange-updated-d-prognoses) | AGR → DSO | Prognosis / PrognosisResponse |
|
||
| [Revocation Flexibility Offer](#revocation-flexibility-offer) | AGR → DSO | FlexOfferRevocation / FlexOfferRevocationResponse |
|
||
| [Exchange Flexibility Orders](#exchange-flexibility-orders) | AGR ← DSO | FlexOrder / FlexOrderResponse |
|
||
|
||
The use cases are explained in the following sections.
|
||
|
||
## Exchange updated D-Prognoses
|
||
|
||
The process diagram is similar to the figure in [Exchange D-Prognoses per Congestion Point](validate-phase.md#exchange-d-prognoses-per-congestion-point).
|
||
|
||
<table>
|
||
<tr>
|
||
<th></th>
|
||
<th colspan="2">D-prognosis</th>
|
||
</tr>
|
||
<tr>
|
||
<th>Goal in context</th>
|
||
<td colspan="2">Changes in D-prognoses to be realized are transmitted.</td>
|
||
</tr>
|
||
<tr>
|
||
<th>Preconditions</th>
|
||
<td colspan="2">AGR has created initial D-prognoses in the Plan/Validate phases, and has subsequently detected deviations in Operate that resulted in a portfolio state that requires those prognoses to be re-created.</td>
|
||
</tr>
|
||
<tr>
|
||
<th>Successful outcome</th>
|
||
<td colspan="2">Prognosis sent to DSO that reflects all relevant changes</td>
|
||
</tr>
|
||
<tr>
|
||
<th rowspan="6">Failure outcome</th>
|
||
<th>RejectionReason</th>
|
||
<th>Cause of rejection</th>
|
||
</tr>
|
||
<tr>
|
||
<td><See Message validation></td>
|
||
<td>D-prognosis failed to pass validation by the DSO</td>
|
||
</tr>
|
||
<tr>
|
||
<td>Lacking ISPs</td>
|
||
<td>The prognosis does not include all ISPs in the Period it applies to</td>
|
||
</tr>
|
||
<tr>
|
||
<td>Power value rejection</td>
|
||
<td>One or more Power values in the prognosis are not plausible</td>
|
||
</tr>
|
||
<tr>
|
||
<td>Subordinate sequence number</td>
|
||
<td>The message sequence is lower than that of a previously received D-prognosis</td>
|
||
</tr>
|
||
<tr>
|
||
<td>[User defined]</td>
|
||
<td>Any other reasonable cause to reject the message</td>
|
||
</tr>
|
||
</table>
|
||
|
||
### Related information
|
||
|
||
The process is similar to that described in [Exchange D-Prognoses per Congestion Point](validate-phase.md#exchange-d-prognoses-per-congestion-point).
|
||
Deviations can be caused by new flexibility orders from the DSO and by unforeseen change of behavior by assets.
|
||
|
||
The basic process for re-creating D-prognoses is the same as that used to create them in the first place, in the plan/validate phases.
|
||
When re-creating prognoses in the operate phase, values for ISPs that are already in the past should remain unchanged, as these will be ignored by DSOs anyway.
|
||
|
||
## Revocation Flexibility Offer
|
||
|
||
The process diagram is similar to the figure in [Revocation of FlexOffer](validate-phase.md#revocation-flexibility-offer).
|
||
|
||
<table>
|
||
<tr>
|
||
<th></th>
|
||
<th colspan="2">Revoke FlexOffer</th>
|
||
</tr>
|
||
<tr>
|
||
<th>Goal in context</th>
|
||
<td colspan="2">Inform the DSO that a previously sent flexibility offer is no longer valid, despite the validity period of the offer not having expired yet.</td>
|
||
</tr>
|
||
<tr>
|
||
<th>Preconditions</th>
|
||
<td colspan="2">A flexibility offer has been sent to and acknowledged by the DSO</td>
|
||
</tr>
|
||
<tr>
|
||
<th>Successful outcome</th>
|
||
<td colspan="2">Flexibility offer revocation notification submitted to the DSO</td>
|
||
</tr>
|
||
<tr>
|
||
<th rowspan="6">Failure outcome</th>
|
||
<th>RejectionReason</th>
|
||
<th>Cause of rejection</th>
|
||
</tr>
|
||
<tr>
|
||
<td><See Message validation></td>
|
||
<td>FlexOfferRevocation failed to pass validation by the DSO</td>
|
||
</tr>
|
||
<tr>
|
||
<td>Flexibility procured</td>
|
||
<td>The FlexOffer cannot be revoked because its flexibility has already been ordered</td>
|
||
</tr>
|
||
<tr>
|
||
<td>[User defined]</td>
|
||
<td>Any other reasonable cause to reject the message</td>
|
||
</tr>
|
||
</table>
|
||
|
||
### Related information
|
||
|
||
The process is similar to that described in [Revocation Flexibility Offer](validate-phase.md#revocation-flexibility-offer).
|
||
|
||
Flexibility offers may be revoked in the operate phase provided that none of the ISPs in the period the offer applies to are
|
||
already in, or past, the operate phase.
|
||
|
||
## Exchange Flexibility Orders
|
||
|
||
This process is triggered when flexibility is required to resolve congestion detected during the operate phase.
|
||
This might, for example, be the case when the prognoses change after the validate phase and there are still FlexOffers available.
|
||
|
||
The process diagram is similar to the figure in [Exchange Flexibility Orders](validate-phase.md#exchange-flexibility-orders).
|
||
|
||
<table>
|
||
<tr>
|
||
<th></th>
|
||
<th colspan="2">Revoke FlexOrder</th>
|
||
</tr>
|
||
<tr>
|
||
<th>Goal in context</th>
|
||
<td colspan="2">Accept (some) flexibility offers to solve congestion during Operate phase.</td>
|
||
</tr>
|
||
<tr>
|
||
<th>Preconditions</th>
|
||
<td colspan="2">Congestion detected while monitoring the grid, corresponding FlexOffer has been received and accepted by DSO and is still valid.</td>
|
||
</tr>
|
||
<tr>
|
||
<th>Successful outcome</th>
|
||
<td colspan="2">Flexibility procured</td>
|
||
</tr>
|
||
<tr>
|
||
<th rowspan="6">Failure outcome</th>
|
||
<th>RejectionReason</th>
|
||
<th>Cause of rejection</th>
|
||
</tr>
|
||
<tr>
|
||
<td><See Message validation></td>
|
||
<td>FlexOrder failed to pass validation by the AGR</td>
|
||
</tr>
|
||
<tr>
|
||
<td>ISP mismatch</td>
|
||
<td>ISPs from the FlexOrder do not match the ISPs given in the FlexOffer</td>
|
||
</tr>
|
||
<tr>
|
||
<td>Power mismatch</td>
|
||
<td>Ordered flexibility does not match the offered flexibility</td>
|
||
</tr>
|
||
<tr>
|
||
<td>Price mismatch</td>
|
||
<td>Price in the order does not match the price given in the offer</td>
|
||
</tr>
|
||
<tr>
|
||
<td>[User defined]</td>
|
||
<td>Any other reasonable cause to reject the message</td>
|
||
</tr>
|
||
</table>
|
||
|
||
### Related information
|
||
|
||
The process is similar to that described in [Exchange Flexibility Orders](validate-phase.md#exchange-flexibility-orders).
|
||
Note that where a FlexOrder is rejected, manual processing is unlikely to result in timely resolution at this stage.
|
||
Note that although the updated D-prognosis is unlikely to be of immediate use to the DSO, it’s definitely required for settlement.
|