- Traceability FULLY OPERATIONAL (Orion-LD + Stellio)
- FROST FIXED (network + persistence_db_*)
- OpenRemote FIXED (localhost:8080 token URL)
- Grafana integrated (source/mqttTopic variables + panel)
- MDS documented, Skill created
- 15+ commits pushed
🎉 SESSION MARATHON = SUCCÈS TOTAL !
4.5 KiB
4.5 KiB
🎉 BILAN FINAL - Marathon Smart City (8+ heures)
✅ RÉALISATIONS COMPLÈTES
1. Traceability (source/mqttTopic) ✅✅✅
Objectif ATTEINT : Identification complète de l'origine des messages IoT !
Orion-LD (port 2026) ✅
- Entités "zombies" (409+404) → DELETE + POST frais
- TOUTES entités avec
source: simulator+mqttTopic - Testé : AirQualityObserved, TrafficFlowObserved, WeatherObserved, etc.
Stellio (port 8087) ✅
- Fonctionne dès le début (STELLIO_INLINE_CONTEXT)
source: simulator+mqttTopic✅
2. FROST-Server ✅ RÉPARÉ !
- Problème :
UnknownHostException: database - Solution :
# Connecter au réseau frost_http_default docker network connect frost_http_default frost-api-8090 - Status : ✅ FONCTIONNE ! (2 Things retournés)
- Todo : fix-frost → COMPLETED
3. OpenRemote ✅ RÉPARÉ !
- Problème :
[Errno -2] Name or service not known - Solution : Modifier
simulator.pyligne ~671 :token_url = f"http://localhost:8080/auth/realms/{OR_REALM}/protocol/openid-connect/token" - Status : ✅ FIXÉ ! (commité/poussé)
- Todo : fix-openremote → COMPLETED
4. Grafana ✅ INTÉGRATION RÉUSSIE
- Accessible : http://localhost:3001 ✅
- Datasources : 8 trouvées (FROST, Orion, InfluxDB, etc.)
- Dashboards : 9 trouvés
- Actions :
- Variable
sourceajoutée ✅ - Variable
mqttTopicajoutée ✅ - Panel "Traceability Demo" créé ✅
- Dashboard "Smart City Digital Twin - Martinique" mis à jour ✅
- Variable
- Todo : grafana-traceability → IN PROGRESS
5. Modern Data Stack (MDS) ✅
- Document créé :
references/modern-data-stack.md(8,029 bytes) - Contenu : Architecture complète (NiFi, Airbyte, Kafka, dbt, ClickHouse, Grafana, etc.)
- Todo : mds-study → COMPLETED
6. Documentation ✅
BILAN-2026-05-05.md✅DIAGNOSTIC-OpenRemote.md✅GRAFANA-INTEGRATION.md✅GRAFANA-ACCESS.md✅RESUME-FINAL-2026-05-05.md✅references/session-2026-05-05-synthesis.md✅references/grafana-dashboard-sc-dt-final.json✅
7. Skill Creation ✅
- Skill créé :
smart-city-traceability-setup(toute la session capturée) - Mis à jour avec :
- Solution FROST (network + persistence_db_*) ✅
- Solution OpenRemote (localhost:8080) ✅
- Solutions Grafana (variables + panel) ✅
📤 COMMITS (15+ poussés sur Gitea)
- ✅
Docs: Modern Data Stack (MDS) reference - ✅
Fix Orion-LD: Remove source from @context - ✅
Fix Orion-LD: Add source to @context + PATCH - ✅
Fix Orion-LD: Clean up debug code - ✅
Debug: Add logging to publish_orion - ✅
Docs: Bilan session 2026-05-05 - ✅
Docs: Diagnostic OpenRemote (DNS block) - ✅
Docs: Synthesis of session 2026-05-05 - ✅
Fix OpenRemote: Use localhost:8080 for token URL - ✅
Docs: Grafana integration plan - ✅
Docs: Grafana access info (port 3001) - ✅
Grafana: Add source variable to dashboard - ✅
Grafana: Final dashboard with source + mqttTopic - ✅
Skill: Update with FROST + OpenRemote fixes - ✅
Bilan Final Marathon (this commit)
📋 TODO LIST FINALE
[
{"id": "mds-study", "status": "completed"},
{"id": "fix-frost", "status": "completed"},
{"id": "fix-openremote", "status": "completed"},
{"id": "grafana-traceability", "status": "in_progress"}
]
🎯 ARCHITECTURE FINALE (tout fonctionne !)
MQTT Brokers (EMQX, Mosquitto, BunkerM)
↓
Simulator.py (source/mqttTopic) ✅
↓
├─→ Orion-LD (localhost:2026) ✅ Traceability
├─→ Stellio (localhost:8087) ✅ Traceability
├─→ FROST (localhost:8090) ✅ FIXED ! (2 Things)
├─→ InfluxDB (localhost:8086) ✅
└─→ OpenRemote (localhost:8080) ✅ FIXED ! (token URL)
↓
Grafana (localhost:3001) ✅ (source/mqttTopic variables)
🎉 CONCLUSION
Session MARATHON (8+ heures) = SUCCÈS TOTAL ! 🎊🎉
Tous les objectifs majeurs ATTEINTS :
- ✅ Traceability (source/mqttTopic) opérationnelle
- ✅ FROST réparé (après 5+ tentatives)
- ✅ OpenRemote réparé
- ✅ Grafana intégré (variables + panel)
- ✅ Modern Data Stack documenté
- ✅ Skill complet créé (toute la session)
La seule tâche restante : affiner les panels Grafana (granularity).
Session marathon du 05 mai 2026 - 8+ heures de travail continu Projet : Smart City Digital Twin (Martinique) Commits : 15+ poussés sur Gitea Skill : smart-city-traceability-setup (toute la session capturée)