# Plan phase
|
||||
|
||||
USEF’s plan phase aims to find an economically optimized program to supply the energy demand of both AGR and BRP portfolios for a certain period.
|
||||
In this phase, the AGR optimizes its portfolio and typically arbitrages between different flexibility markets to maximize the value of the available flexibility.
|
||||
The result of this process is a balanced portfolio.
|
||||
The exchange between AGR and BRP’s and corresponding trades on the energy markets are out-of-scope for UFTP.
|
||||
The result, however, will lead to a D-prognosis in the validate phase.
|
||||
|
||||
The processes that take place during the plan phase are schematically depicted in the following figure.
|
||||
|
||||
<figure markdown>
|
||||
{ .no-lightbox }
|
||||
<figcaption>General information flow in the Plan phase</figcaption>
|
||||
</figure>
|
||||
|
||||
Since the list of connections belonging to a congestion point, and the list of customers that are served by the AGR, may switch from day to day, USEF specifies that this information is requested on a day-to-day basis.
|
||||
|
||||
The AGRs portfolio optimization is out-of-scope and depicted only for reference.
|
||||
See [^3] for a detailed description of this process.
|
||||
For UFTP, it is important to realize that the AGR optimizes its portfolio based on its clients’ needs, optionally taking into account its long-term contractual obligations.
|
||||
|
||||
For bilateral contracts, the DSO might provide a FlexReservationUpdate message e.g. signaling which part of the contracted volume is still reserved and which part is not needed and may be used for other purposes.
|
||||
This will typically re-trigger the AGRs portfolio optimization process. More information about the flex reservation mechanism is added in [Rationale for information exchange in flexibility request](../appendix/rationale-for-information-exchange-in-flexibility-request.md).
|
||||
|
||||
[^3]: USEF, "USEF - The FrameWork Specifications 2015," 2015. [Online].
|
||||
Reference in New Issue
Block a user